Sign in
The system is built at Dingnan Village located in the center of Xiluo Township. The construction period was right after the rainy season but only 26 working days were taken to complete the whole project. In the project, the national top quality of high efficiency NSP Power mono-crystalline module 315W was applied to match with the inverter produced by Delta Electronics; HAMAK series anode 15μm and acrylic paint 10μm as anti-corrosive treatment was applied with the safety validation of structural engineer.