Sign in
The system is located Changhua Coastal Industrial Park. The project has been completed in one month from the contract signed, material preparations to register in the Taiwan Power Company. The national top quality of high efficiency NSP Power module 305W was applied to match with the inverter produced by Delta Electronics; the framework was coated with HAMAK ANODE 7μm and acrylic paint 7μm as anti-corrosive treatment was applied with the safety validation of structural engineer.